Site survey and prerequisites
SERVICE / 01
From site readiness to operational equipment
Installation & commissioning
Bio-MedX coordinates technical prerequisites, delivery, installation, testing and handover so every device starts in a controlled environment.

Who is it for?Clinics, hospitals, laboratories and practices installing new equipment or reorganising a technical platform.
Installation and testing
Acceptance and handover
Our approach
Successful installation starts before delivery.
Space, power supply, ventilation, networks, access routes and interfaces with other equipment are checked before delivery. This preparation reduces delays, last-minute changes and compliance risks.
After positioning and connection, Bio-MedX organises functional tests, configuration records, technical acceptance and team handover. Any outstanding items are clearly documented and followed up.
Scope
A controlled end-to-end deployment.
The scope is adapted to the equipment, site and respective responsibilities of the supplier, facility and technical partners.
Site readiness
Access, dimensions, power, cooling, network, safety and positioning constraints.
Coordinated logistics
Delivery planning, handling, visual inspection and verification of received items.
Installation & qualification
Assembly, connection, configuration, functional testing and device-appropriate controls.
Team handover
Operation, routine care, safety guidance and the support request pathway.
In practice
Real environments, concrete actions.

Prepare · install · verify — the three stages of controlled commissioning.
Workflow
Four steps with continuous traceability.
- 01
Scoping
Equipment, schedule, site, responsibilities and prerequisites are confirmed.
- 02
Preparation
Pre-delivery actions are listed and followed with the facility.
- 03
Deployment
Delivery, installation, configuration and testing are coordinated.
- 04
Acceptance
Results, outstanding items, documents and next actions are shared.
Possible deliverables
Useful work leaves a clear record.
- Site-survey report and prerequisite checklist
- Installation plan and coordinated responsibilities
- Documented configuration and controls
- Acceptance report and outstanding-item follow-up
- Operating guidance and support pathway
Prepare your installation before the equipment arrives.
Share the equipment, site and target date: we will help identify prerequisites and the right support scope.